Time:2020-9-18 17:07:08
Describe:
It is used for electrical connection between trackside equipment and rail of zPW-2000A uninsulated track circuit. The equipment and rail are connected reliably through lead wire to ensure reliable transmission of frequency shift information on rail. Standard length is 2, 2.2, 2.5, 3.7, 3.9, 4.2 meters five, special length can be customized; The terminals of lead wiring can be cold crimped terminal and plug plug two ways; Ladle copper wiring quality meets the technical requirements of railway departments.
It is used for electrical connection between trackside equipment and rail of zPW-2000A uninsulated track circuit. The equipment and rail are connected reliably through lead wire to ensure reliable transmission of frequency shift information on rail. Standard length is 2, 2.2, 2.5, 3.7, 3.9, 4.2 meters five, special length can be customized; The terminals of lead wiring can be cold crimped terminal and plug plug two ways; Ladle copper wiring quality meets the technical requirements of railway departments.
According to standard: "ZPW-2000A Ladle Copper Rail Wiring technical conditions" (temporary), this technical conditions by the ministry of Railways institute of Standard Metrology proposed and centralized.